Mechanical Department

In co-operation with ELIS-ENGINEERING s.r.o., we manufacture and assemble excavation vehicles for coal feeding for PLZEŇSKÁ TEPLÁRENSKÁ a.s. The vehicles of this construction were assembled in the past for the Počerady power station, EU Komořany, VVV Most and the Plzeň heating plant.

FEST-HF

From the closed premises for the production of tiling in Rakovník, we dismantle entire technological units for LB MINERALS s.r.o. and transport them to the plants in Kaznějov and Borovany. Some technology lines will be installed in new plants.

FEST-HF FEST-HF

Civil Engineering Department

The construction of two family houses in Třemošná and in Chotíkov is in progress.

FEST-HF FEST-HF

Electrical Installation Department

At present we are installing a remote control for two cranes of PILSEN STEEL s.r.o.

In addition, preparations are ongoing for the installation of Wampfler encased trolley wires for ŠKODA ELECTRIC s.r.o.

 

The entire company, including the projection department, is working on the long-term project “Static Securing of the Crane Track of Building 20” for PILSEN STEEL s.r.o.